What are the time limits for filing an interim copy of a foreign application?
The time limits for filing an interim copy of a foreign application are specified in 37 CFR 1.55(j). According to the MPEP: 37 CFR 1.55(j) also provides that the interim copy of the foreign application and cover sheet must be filed within the later of sixteen months from the filing date of the prior foreign…
Read MoreWhat are the time limits for claiming priority in a national stage application under 35 U.S.C. 371?
In a national stage application under 35 U.S.C. 371, the claim for priority must be made within the time limit set forth in the PCT and the Regulations under the PCT. According to 37 CFR 1.55(d)(2), this is the general rule, with some exceptions provided in paragraph (e) of the same section. The MPEP states:…
Read More