+1.970.776.4355 · Loveland, CO · Russ Krajec, principal Currently accepting Fractional Chief IP Officer engagements →

How does the fee structure work for extensions of time under 37 CFR 1.136(a)?

Source: FAQ (MPEP-Based)

This page is an FAQ based on guidance from the Manual of Patent Examining Procedure. This is information, not legal advice.

Source: FAQ (MPEP-Based)BlueIron Update: 2024-09-10

This page is an FAQ based on guidance from the Manual of Patent Examining Procedure. It is provided as guidance, with links to the ground truth sources. This is information only: it is not legal advice.

The fee structure for extensions of time under 37 CFR 1.136(a) is cumulative. The MPEP explains:

The fees for extensions of time under 37 CFR 1.136(a) are set forth in 37 CFR 1.17(a) and are subject to a 50% reduction for persons or concerns qualifying as small entities. The fees itemized at 37 CFR 1.17(a) are cumulative.

This means that if you’ve already paid for a 1-month extension and need an additional month, you would pay the difference between the 2-month fee and the 1-month fee you’ve already paid. The MPEP provides an example:

Thus, if an applicant has paid an extension fee in the amount set forth in 37 CFR 1.17(a)(l) for a 1-month extension of time and thereafter decides that an additional 1 month is needed, the proper fee would be the amount set forth in 37 CFR 1.17(a)(2) less the amount set forth in 37 CFR 1.17(a)(l) which was previously paid.

Tags: extension of time, MPEP, patent fees, USPTO