+1.970.776.4355 · Loveland, CO · Russ Krajec, principal Currently accepting Fractional Chief IP Officer engagements →

Are extensions of time available for responding to PTAB requests for additional briefing?

Source: FAQ (MPEP-Based)

This page is an FAQ based on guidance from the Manual of Patent Examining Procedure. This is information, not legal advice.

Source: FAQ (MPEP-Based)BlueIron Update: 2024-09-27

This page is an FAQ based on guidance from the Manual of Patent Examining Procedure. It is provided as guidance, with links to the ground truth sources. This is information only: it is not legal advice.

Extensions of time for responding to Patent Trial and Appeal Board (PTAB) requests for additional briefing are limited. According to MPEP 1212:

“Extensions of time are only available under 37 CFR 1.136(b).“

This means that extensions are not automatically granted and are subject to stricter requirements than standard extensions. Under 37 CFR 1.136(b), extensions may be granted for “sufficient cause” and must be filed on or before the due date for the response. These extensions are granted at the discretion of the PTAB and are not guaranteed.

Tags: appeal procedure, Ptab, time extensions