This page consolidates and annotates all enforceable requirements under MPEP § 507, including statutory authority, regulatory rules, examiner guidance, and practice notes. It is provided as guidance, with links to the ground truth sources. This is information only, it is not legal advice.

Drawing Review in the Office of Patent Application Processing

This section addresses Drawing Review in the Office of Patent Application Processing. Contains: 2 requirements, 1 permission, and 4 other statements.

Key Rules

Topic

Fee Requirements

3 rules
StatutoryRequiredAlways
[mpep-507-92f1471e4448490b55412131]
Corrected Drawings Required Upon Notice From OPAP
Note:
Applicants must submit corrected drawings within two months of receiving a notice from OPAP to avoid abandoning the application.

If OPAP objects to the drawings and sends applicant a Notice requiring submission of corrected drawings within a set time period (usually two months), corrected drawings must be filed, in paper, to the mailing address set forth in the Notice, along with any other items required by OPAP, to avoid abandonment of the application. No fee will be necessary for filing corrected drawings which are required by OPAP. Otherwise, in most situations, patent application publications and patents will reflect the quality of the drawings that are included with a patent application on filing unless applicant voluntarily submits better quality drawings as set forth in MPEP § 1121.

Jump to MPEP SourceFee Requirements
StatutoryRequiredAlways
[mpep-507-b4739fb2e88ee8701d5864de]
No Fee for Corrected Drawings Required by OPAP
Note:
Applicants do not need to pay a fee when submitting corrected drawings requested by the Office of Patent Application Processing within the specified time period.

If OPAP objects to the drawings and sends applicant a Notice requiring submission of corrected drawings within a set time period (usually two months), corrected drawings must be filed, in paper, to the mailing address set forth in the Notice, along with any other items required by OPAP, to avoid abandonment of the application. No fee will be necessary for filing corrected drawings which are required by OPAP. Otherwise, in most situations, patent application publications and patents will reflect the quality of the drawings that are included with a patent application on filing unless applicant voluntarily submits better quality drawings as set forth in MPEP § 1121.

Jump to MPEP SourceFee Requirements
StatutoryInformativeAlways
[mpep-507-549a23551a10a54991e7d204]
Drawings Reflect Application Filing Quality Unless Improved
Note:
Patent application publications and patents will reflect the drawings submitted at filing unless applicant voluntarily submits higher quality drawings as per MPEP § 1121.

If OPAP objects to the drawings and sends applicant a Notice requiring submission of corrected drawings within a set time period (usually two months), corrected drawings must be filed, in paper, to the mailing address set forth in the Notice, along with any other items required by OPAP, to avoid abandonment of the application. No fee will be necessary for filing corrected drawings which are required by OPAP. Otherwise, in most situations, patent application publications and patents will reflect the quality of the drawings that are included with a patent application on filing unless applicant voluntarily submits better quality drawings as set forth in MPEP § 1121.

Jump to MPEP SourceFee Requirements
Topic

Director Authority and Petitions (MPEP 1000)

2 rules
MPEP GuidanceInformativeAlways
[mpep-507-e76702bb651b79201f71d901]
Color Drawings Prohibited Without Petition
Note:
OPAP may object to and require corrected drawings if they contain color drawings or photographs, but not a petition to accept them.

Under the OPAP review process, OPAP may object to and require corrected drawings within a set time period, if the drawings:

(G) contain color drawings or color photographs, but not a petition to accept color drawings/ photographs.

Jump to MPEP SourceDirector Authority and Petitions (MPEP 1000)
MPEP GuidanceInformativeAlways
[mpep-507-2b7901d6fbf126e3b527dfc2]
Black and White Copies No Longer Required for Color Drawings/Photographs
Note:
OPAP no longer requires black and white copies of color drawings or photographs in patent application processing.

Under the OPAP review process, OPAP may object to and require corrected drawings within a set time period, if the drawings:

Note that the requirement for a black and white photocopy of any color drawings/photographs has been eliminated.

Jump to MPEP SourceDirector Authority and Petitions (MPEP 1000)
Topic

Plant Patent Practice

1 rules
MPEP GuidancePermittedAlways
[mpep-507-3ca135fa84d26bd504043f25]
Office of Patent Application Processing Reviews Drawings for Publication
Note:
OPAP reviews drawings in utility and plant patent applications to ensure they can be effectively scanned for publication, while design application drawings are not reviewed.

The Office of Patent Application Processing (OPAP) performs an initial review of drawings in new utility and plant patent applications to determine whether the drawings can be effectively scanned for publication purposes. Design applications are not published, and drawings filed in design patent applications are not reviewed by OPAP for publication purposes. The standard of review employed by OPAP is such that most drawings, including those that have been indicated by applicant to be "informal drawings," will be acceptable.

Jump to MPEP SourcePlant Patent PracticeDesign Patent DrawingsPlant Patent Drawings
Topic

Design Patent Practice

1 rules
MPEP GuidanceInformativeAlways
[mpep-507-28cdb899661b9297dec89d8b]
Design Patent Drawings Not Reviewed for Publication
Note:
Drawings in design patent applications are not reviewed by OPAP for publication purposes.

The Office of Patent Application Processing (OPAP) performs an initial review of drawings in new utility and plant patent applications to determine whether the drawings can be effectively scanned for publication purposes. Design applications are not published, and drawings filed in design patent applications are not reviewed by OPAP for publication purposes. The standard of review employed by OPAP is such that most drawings, including those that have been indicated by applicant to be "informal drawings," will be acceptable.

Jump to MPEP SourceDesign Patent PracticeDesign Patent DrawingsPlant Patent Drawings
Topic

Design Patent Drawings

1 rules
MPEP GuidanceInformativeAlways
[mpep-507-24f205121a0d81410e84a90e]
Most Drawings Including Informal Ones Are Acceptable
Note:
OPAP reviews drawings in utility and plant patent applications, accepting most drawings including those marked as informal.

The Office of Patent Application Processing (OPAP) performs an initial review of drawings in new utility and plant patent applications to determine whether the drawings can be effectively scanned for publication purposes. Design applications are not published, and drawings filed in design patent applications are not reviewed by OPAP for publication purposes. The standard of review employed by OPAP is such that most drawings, including those that have been indicated by applicant to be "informal drawings," will be acceptable.

Jump to MPEP SourceDesign Patent DrawingsPlant Patent DrawingsDesign Patent Practice
Topic

Copy Quality

1 rules
MPEP GuidancePermittedAlways
[mpep-507-816f74de08e55cf7ea7625d8]
Corrected Drawings Required for Legibility and Compliance
Note:
OPAP may require corrected drawings if they are not legible, missing lead lines, contain excessive text, or do not meet size and margin requirements.
Under the OPAP review process, OPAP may object to and require corrected drawings within a set time period, if the drawings:
  • (A) have a line quality that is too light to be reproduced (weight of all lines and letters must be heavy enough to permit adequate reproduction) or text that is illegible (reference characters, sheet numbers, and view numbers must be plain and legible). See 37 CFR 1.84(l) and (p)(1);
  • (B) have missing lead lines. See 37 CFR 1.84(q). Lead lines are those lines between the reference characters and the details referred to;
  • (C) contain excessive text or text that is not in English (including, for example, a flow chart that was originally not in English that has been marked up to include the English text). See 37 CFR 1.84(o) and (p)(2) and 37 CFR 1.52(d);
  • (D) do not have the appropriate margin or are not on the correct size paper. See 37 CFR 1.84(f) and (g). Each sheet must include a top margin of at least 2.5 cm. (1 inch), a left size margin of at least 2.5 cm. (1 inch), a right size margin of at least 1.5 cm. (5/8 inch), and a bottom margin of at least 1.0 cm. (3/8 inch). The size of the sheets on which drawings are made must be either 21.0 cm. by 29.7 cm. (DIN size A4) or 21.6 cm. by 27.9 cm. (8-1/2 by 11 inches);
  • (E) have more than one figure and each figure is not labeled “Fig.” with a consecutive Arabic numeral (1, 2, etc.) or an Arabic numeral and capital letter in the English alphabet (A, B, etc.). See 37 CFR 1.84(u)(1);
  • (F) include photographs of the claimed invention which are capable of illustration by other medium such as ink drawings, and which are illegible after scanning. See 37 CFR 1.84(b); and
  • (G) contain color drawings or color photographs, but not a petition to accept color drawings/ photographs. Note that the requirement for a black and white photocopy of any color drawings/photographs has been eliminated.
Jump to MPEP SourceCopy QualityMargin RequirementsPaper Size Requirements

Citations

Primary topicCitation
Copy Quality37 CFR § 1.52(d)
Copy Quality37 CFR § 1.84(b)
Copy Quality37 CFR § 1.84(f)
Copy Quality37 CFR § 1.84(l)
Copy Quality37 CFR § 1.84(o)
Copy Quality37 CFR § 1.84(q)
Copy Quality37 CFR § 1.84(u)(1)
Fee RequirementsMPEP § 1121

Source Text from USPTO’s MPEP

This is an exact copy of the MPEP from the USPTO. It is here for your reference to see the section in context.